EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wstoelting
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (396)
Research
- (3)
Workshop
- (3)
Empennage
Fuselage
- (74)
Firewall
- (1)
Tail Feathers
- (5)
Wings
- (135)
-
Travel Struts
-
Jury Strut Install
-
Installed Wings
-
Flap Springs
-
Aileron Fabric
-
Right Side Elevator
-
Rudder Fabric
-
Horizontal...
-
Left Aileron
-
Left Flap
-
Right Flap
-
Left Flap
-
Elevator Trim Tab
-
Right Wing Fabric
-
Right Wing Fabric
-
Right Wing Fabric
-
Right Wing Top side...
-
Right Wing Fabric
-
Magnetometer
-
Polyfiber SuperFil
-
Left Wing Fabric
-
Left wing Fabric
-
Lower Side...
-
Fabric Supplies
-
Polybrush on...
-
Prep for Covering...
-
Pitot and Static...
-
Left Aileron Fabric...
-
Filled Leading Edge...
-
Filled Leading Edge...
-
Smoothing Out...
-
Varnish False Ribs,...
-
Wing Tip &Strobe...
-
Nav Light Mounting...
-
Nutplates, Adel...
-
Left Wing Control...
-
Left Wing Control...
-
Left Wing Control...
-
Flap Hinges- Left Wing
-
Left Wing Aileron...
-
Leading Edge Cuffs
-
Leading Edge materials
-
Left Flap Leading Edge
-
Left Wing False Ribs...
-
Left Aileron...
-
Left Wing Trailing Edge
-
Left Wing Flap
-
100 pack of CCP45...
-
Left Wing Flap
-
Right Wing Tip
-
False Rib Install,...
-
Right Flap Fabric...
-
Fitting Fabric...
-
Fabric Plates -...
-
Fabric plates Right...
-
Right Wing Trailing...
-
Wing Control Cable...
-
Aileron Hinge...
-
Engine Mount Powder...
-
Flap Hinges Right Wing
-
Flap Hinges Right Wing
-
Right Wing Trailing...
-
Left Aileron Leading...
-
Aileron Pulley...
-
Flap Pulley Block...
-
Left Aileron Leading...
-
Epoxy Left Quarter...
-
Epoxy Left Quarter...
-
Right Wing Return...
-
Left Aileron Leading...
-
Right Wing Flap...
-
Pulley Blocks
-
Varnished Left Wing
-
Left Wing Root Rib...
-
Flap Leading...
-
Left Wing Tank Cover
-
Butt Ribs and...
-
Aileron Hinge and...
-
Aileron Leading Edge...
-
Aileron Leading Edge...
-
Flap Leading Edge
-
Right Flap Hinges...
-
Varnish and Aileron...
-
Right wing root rib...
-
Root Rib Web Out
-
Epoxy Varnish to...
-
False Rib Install In...
-
Fuel Tank Cover...
-
Slotted Trailing...
-
Flap and Aileron Rt...
-
Flap and Aileron...
-
Left Wing Trailing Edge
-
Right wing trailing...
-
Aileron and Flap...
-
Butt Rib Left
-
Aileron Leading Edge...
-
Filler Rib Left Wing
-
Right Aileron...
-
Butt Rib Fuel Tank...
-
Left Wing Root Rib
-
Fuel Tank Install...
-
Right Wing Fuel Tank...
-
Right Wing Wing Tip...
-
Installed Left Wing
-
Left Wing Tip Trimming
-
Right Wing Butt Rib
-
Rib 9 Nutplates for...
-
Epoxy Varnish
-
Right Wing Tank...
-
Tank Cover Front...
-
Left Root Rib...
-
Butt Rib Reinforcement
-
Left Wing-Installed...
-
Left Wing-Strut...
-
Flight Test Manual...
-
Lift Strut Brackets-...
-
Fuel Tank Cover...
-
Right Wing Tank Rib
-
Left Wing Stringer...
-
End Rib Drag Links
-
Left Wing Gussets
-
Bonding Root Rib
-
Root Rib Cutouts
-
Ailerons Trailing Edge
-
Flaps
-
Fuel Tank Install
-
Fuel tank support...
-
Flap Trailing Edges
-
Installed Right Wing
-
Trim Trailing Edge...
-
Lift Strut Wing...
-
Jury Strut Brackets,...
-
Wing Tip Rib Drag Links
-
Attachment Doubler
-
Gussets
Controls
- (7)
Avionics
- (8)
Lighting
- (2)
Instrument Panel
- (13)
Landing Gear
- (19)
Engine
- (41)
Propeller
- (5)
Fuel System
- (30)
Interior Finish
- (8)
Paint / Decals
- (22)
-
Paint Landing Gear Legs
-
Painted Fuselage
-
Polyspray on Fuselage
-
Prepping Fuselage...
-
Right Wing
-
Left Wing Paint
-
Left Wing Paint Coats
-
More Paint Supplies
-
Left Wing UV Polyspray
-
Left Wing Polybrush...
-
Flaps Painted
-
Ailerons & Flaps...
-
Insignia White...
-
Polyspray Control...
-
Polybrush Control...
-
Flaps- 2 coats of...
-
Ready to Spray
-
Polyfiber Materials
-
Zinc Chromate Primer
-
Epoxy Prime Parts
-
Priming of Small Parts
-
Paint Scheme Concept
Inspection
- (2)
Tools
- (18)
Builder Name:
Wade Stoelting
-
Project:
Just - Highlander
-
VIEW REPORTS
Total Hours:
799.9
Total Flight Time:
Total Expense:
$70783.69
Start/Last Date:
Oct 09, 2019 - No Finish Date
Engine:
Yamaha Apex
Friendly URL:
https://eaabuilderslog.org?s=wstoelting
Home or Last Project Picture
May 10, 2024
SportEX EFIS
Category: Avionics
Received GRT SportEX EFIS and Outside Air temperature probe. Did initial panel fit check. Now the wiring has to be completed.
20240510_154009.jpg
20240510_155656.jpg
May 05, 2024
Trailered to New Montana Home
- (11 hours)
Category: Fuselage
My friend, Eric loaned his trailer for me to transport my plane to our new home in Montana. Can finally get back to building.
20240501_152307.jpg
20240501_155549.jpg
20240505_140426.jpg
Apr 29, 2024
Travel Struts
- (1.5 hours)
Category: Wings
Preparing airplane for trailer transporting to Montana. Removed front leading edge spar pins, and rotated wings back. Fabricated wing travel support/secure struts from 1/2 square tubing. Secured wings for trailering.
20240429_163826.jpg
20240429_163840.jpg
Apr 26, 2024
Cable Pulleys on Wings
- (3 hours)
Category: Controls
Located and installed left and right aileron pulleys with cable keepers (4 places). Installed flap control pulleys and cable keepers (2 places). Installed cover/closeout plates.
20240428_131213.jpg
20240428_131159.jpg
Apr 24, 2024
Jury Strut Install
- (3 hours)
Category: Wings
Located and drilled jury strut holes in weldment and the bracket straps that attach jury strut to wing struts. Painted brackets. Fastened in place with hardware.
20240428_131150.jpg
Feb 26, 2024
Mounted Propeller
- (1 hour)
Category: Propeller
Installed propeller. Used hardware torque info from Kyiv Propeller USA website 18 ft-lbs. Set ground adjustable pitch with gauge provided by NR Prop. Installed propeller without nose cone backing plate for initial engine runups and then will retorque the pitch adjustment screws. Then remove hub to install backing plate.
20240226_160138.jpg
Feb 05, 2024
Vinyl Wrap Kickpanels and Turtledeck
- (4 hours)
Category: Fuselage
Ordered vinyl wrap for kickpanels and turtle deck from Amazon. The orange color and gloss may not match perfectly with airplane paint but adequate. ViVid brand. I am trying to minimize further painting effort due to current Temps, and no more paint booth.
20240206_151832.jpg
20240206_151933.jpg
20240206_152121.jpg
Jan 24, 2024
Installed Wings
- (4 hours)
Category: Wings
Moved plane and wings from garage to hangar. Installed wings after arriving at hangar. Still have a few hardware installation fixes but it sure looks like a plane now.
20240120_100243.jpg
20240124_164450.jpg
Jan 02, 2024
Electrical Supplies
Category: Instrument Panel
PIDG ring connectors, toggle switches, 20ga wire, 22ga wire, 2 conductor and 3 Co ductor shielded wire...
20240102_180754.jpg
Jan 01, 2024
Windshield
- (6 hours)
Category: Fuselage
Rough cutout the windshield. This is the second attempt as I undercut the first one. Afterwards, made further precision trimming and drilled mounting holes, sanded smooth edges.
20240101_090941.jpg
20240101_110002.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.